国产精品亚洲第五区在线,99视频一区,亚洲性无码av在线,青青自拍视频一区二区三区,国语自产精品视频在线第,国产啪在线,亚洲α片

CONTACT US    

Nantong JunHai Machinery Tech. Co., Ltd.
Address: Taoyuan Town, Rugao City, Jiangsu Province High-tech Industrial Park
Zip Code:226400
TEL:+86 18912208346(Mr Tony)

          +86 13646196569,

         +86 0513-88541237
FAX: +86 0513-88541237 / 88541236
E-mail:ntjhjx@163.com
Q Q: 1404732482

MSN:  ntjhjx@live.com

NEWS

Hoist motor maintenance
 

The motor is an important part of the winch, winch is also the most expensive parts, if damaged, repair or replacement costs that would be too high. So here we remind customers to take good care of the windlass or winch motor. Maintenance methods are as follows:

1、使用環(huán)境應經(jīng)常保持干燥,電動(dòng)機表面應保持清潔,進(jìn)風(fēng)口不應受塵土、纖維等阻礙。

1, the use of the environment should be kept dry, motor surface should be kept clean, Menorca should not receive dust, fiber and other obstacles.

2、當電動(dòng)機的熱保護連續發(fā)生動(dòng)作時(shí),應查明故障來(lái)自電動(dòng)機還是超負荷或保護裝置整定值太低,消除故障后,方可投入運行。

2, when the motor thermal protection continuously happen when, should find fault from motor or overload or protection device setting value is too low, eliminate malfunction, can be put into operation.

3、應保證電動(dòng)機在運行過(guò)程中良好的潤滑。一般的電動(dòng)機運行5000小時(shí)左右,即應補充或更換潤滑脂,運行中發(fā)現軸承過(guò)熱或潤滑變質(zhì)時(shí),液壓及時(shí)換潤滑脂。更換潤滑脂時(shí),應清除舊的潤滑油,并有汽油洗凈軸承及軸承蓋的油槽,然后將ZL-3鋰基脂填充軸承內外圈之間的空腔的1/2(對2極)及2/3(對4、6、8極)。

3, should ensure good lubricating motor during operation. General motors run for about 5000 hours, should complement or replace grease, bearing overheating or lubrication modification found in operation, the hydraulic timely for lubricating grease. Replacing the grease, should remove old lubricating oil, and the oil tank of gasoline to clean the bearing and bearing cover, then the ZL-3 grease filling the cavity between the inner and outer ring of the bearing 1/2 (2 pole) and 2/3 (4, 6, 8).

4、當軸承的壽命終了時(shí),電動(dòng)機運行的振動(dòng)及噪聲將明顯增大,檢查軸承的徑向游隙達到下列值時(shí),即應更換軸承。

4, when the bearing life end, motor running vibration and noise will increase obviously, check the radial clearance of the bearings to the following values, i.e.replace bearings.

5、拆卸電動(dòng)機時(shí),從軸伸端或非伸端取出轉子都可以。如果沒(méi)有必要卸下風(fēng)扇,還是從非軸伸端取出轉子較為便利,從定子中抽出轉子時(shí),應防止損壞定子繞組或絕緣。

5, removing the motor, from the shaft extension end or end of rotor can be taken out. If it is not necessary to remove the fan, or from a shaft extension end out rotor is more convenient, from out of the rotor in the stator, stator winding insulation should prevent damage or.

6、更換繞組時(shí)必須記下原繞組的形式,尺寸及匝數,線(xiàn)規等,當失落了這些數據時(shí),應向制造廠(chǎng)索取,隨意更改原設計繞組,常常使電動(dòng)機某項或幾項性能惡化,甚至于無(wú)法使用。

6, the replacement of winding must take note of the primary winding form, size and number of turns, wire, when the loss of the data, should ask factory, arbitrarily change the original design of the motor winding, often one or several performance deterioration, and even can not be used.

Copyright © 2014 Nantong City, Jun Hai Machinery Technology Co., Ltd.Copyright © 2014 Nantong City, Jun Hai Machinery Technology Co., Ltd.
克山县| 化州市| 富锦市| 蒙自县| 普定县| 湘潭市| 松桃| 永平县| 乌鲁木齐县| 通化市| 丰城市| 德清县| 太康县| 苍山县| 南丰县| 双辽市| 剑阁县| 交口县| 灌云县| 克拉玛依市| 大埔区| 简阳市| 溆浦县| 定西市| 叶城县| 金阳县| 赤壁市| 西乡县| 永吉县| 承德县| 财经| 阿勒泰市| 宣汉县| 眉山市| 九寨沟县| 尼玛县| 万年县| 顺义区| 东兰县| 乐清市| 永德县|